Case study

Extra low voltage transformer stacks for mill screen heaters

Brick manufacturingPGH Bricks and Pavers, Oxley2025

The situation

PGH Bricks and Pavers runs an annual four-week shutdown at their Oxley plant. The extra low voltage transformers supplying the mill screen heaters were scheduled for upgrade during that window.

The scope

Build two new extra low voltage transformer stacks, one for each set of mill screens. Disconnect the existing transformers, re-route the supplies to the new stacks, then commission and return the screens to service inside the shutdown window.

Work like this only happens during a shutdown. The screens are central to the process and the supplies cannot be re-routed while the mill is running, so the upgrade has to be planned against a window already carrying the rest of the site's annual maintenance.

The outcome

Both transformer stacks were built and installed, the existing transformers disconnected and the supplies re-routed, and the screens commissioned and back online within the shutdown period.

Extra low voltage transformer stack part-built
← All projects and case studies

Get in touch

Something similar on your site?

Tell us the site, the plant involved and what is happening, and we will tell you what we can do.

0434 059 952

Commercial and industrial sites only. We do not do domestic or residential work.

Send an enquiry

Required fields are marked *

Thanks, your enquiry has been sent. We will get back to you shortly. If it is urgent, please call 0434 059 952.

Call Sparktech Enquire